Vesperman Mudroom Cabinetry

$2,831.00
Only 1 available

Custom Design/Build Mudroom Cabinetry

Cypress Designs will build a custom mudroom cabinetry solution for the client’s home in Blaine, MN. 

Cabinetry will include an upper full length cabinetry with 4 doors, a middle full length cabinet with 4 open cubbies and a vertical cabinet with 4 open cubbies. 

Side Offset Trim will be provided and fit during install. 

Faceframes will be pre-built and fit onsite during the install.

 

All Cabinetry and faceframes will be paint grade with no exposed hardware

Doors will include Blum Softclose hinges and faceframe clips.

All cabinetry and faceframes will be unfinished for client supplied paint after the install is complete

Proposal includes turn-key installation of the cabinetry, faceframes and off-set trim.

 

HDF – 4

4/4 Faceframe Stock – 46.7

Labor – 36

Hardware - 4

Consumables – 1.75

 

Payment is non-refundable and acts as a contractual agreement between client and Cypress Designs.

Cypress Designs reserves the right to modify the actual build and installation from proposed conceptual designs withing the limitations of the design aesthetic.

State Sales Tax will be added to the total of this proposal upon payment.

A 2.5% fee will be charge for credit card processing fee if client chooses this payment method

Current Estimated build cue is 6-8 weeks from deposit date

  

Add To Cart

Custom Design/Build Mudroom Cabinetry

Cypress Designs will build a custom mudroom cabinetry solution for the client’s home in Blaine, MN. 

Cabinetry will include an upper full length cabinetry with 4 doors, a middle full length cabinet with 4 open cubbies and a vertical cabinet with 4 open cubbies. 

Side Offset Trim will be provided and fit during install. 

Faceframes will be pre-built and fit onsite during the install.

 

All Cabinetry and faceframes will be paint grade with no exposed hardware

Doors will include Blum Softclose hinges and faceframe clips.

All cabinetry and faceframes will be unfinished for client supplied paint after the install is complete

Proposal includes turn-key installation of the cabinetry, faceframes and off-set trim.

 

HDF – 4

4/4 Faceframe Stock – 46.7

Labor – 36

Hardware - 4

Consumables – 1.75

 

Payment is non-refundable and acts as a contractual agreement between client and Cypress Designs.

Cypress Designs reserves the right to modify the actual build and installation from proposed conceptual designs withing the limitations of the design aesthetic.

State Sales Tax will be added to the total of this proposal upon payment.

A 2.5% fee will be charge for credit card processing fee if client chooses this payment method

Current Estimated build cue is 6-8 weeks from deposit date

  

Custom Design/Build Mudroom Cabinetry

Cypress Designs will build a custom mudroom cabinetry solution for the client’s home in Blaine, MN. 

Cabinetry will include an upper full length cabinetry with 4 doors, a middle full length cabinet with 4 open cubbies and a vertical cabinet with 4 open cubbies. 

Side Offset Trim will be provided and fit during install. 

Faceframes will be pre-built and fit onsite during the install.

 

All Cabinetry and faceframes will be paint grade with no exposed hardware

Doors will include Blum Softclose hinges and faceframe clips.

All cabinetry and faceframes will be unfinished for client supplied paint after the install is complete

Proposal includes turn-key installation of the cabinetry, faceframes and off-set trim.

 

HDF – 4

4/4 Faceframe Stock – 46.7

Labor – 36

Hardware - 4

Consumables – 1.75

 

Payment is non-refundable and acts as a contractual agreement between client and Cypress Designs.

Cypress Designs reserves the right to modify the actual build and installation from proposed conceptual designs withing the limitations of the design aesthetic.

State Sales Tax will be added to the total of this proposal upon payment.

A 2.5% fee will be charge for credit card processing fee if client chooses this payment method

Current Estimated build cue is 6-8 weeks from deposit date